CASE STUDIES

cormac contracting man working

    The rust prevention experts in Sydney, Australia 

    If you are searching a highly effective rust prevention system for your structure or installation, you need to discuss your requirements with the highly professional team of corrosion prevention engineers here at Cormac Contracting. We are already proving services for many blue chip corporations all over the globe.

    Major savings through rust prevention

    Our expertly applied rust prevention systems are already responsible for saving our astute clients substantial amounts in the saved costs of plant maintenance and replacement. With a wealth of experience and expertise within our area of expertise, we have already established a proven track record and a solid reputation for providing excellent results.

    The rust prevention resources that you need

    With a huge team of highly qualified personnel available to us, we can ensure that projects of any size or complexity receive our long-term attention and monitoring. Everything that we undertake is, of course, quality-monitored and our operatives are constantly being trained and updated in every new development that affects our industry.

    Case histories

    Please take some time to review some of our case histories on the page below and contact us to discuss your requirements soon.

    Cormac Case history - Offshore

    Project: Prelude – Well heads and fatigue joints
    Client: SHELL
    Owner: SHELL
    Scope: TSA of 16 HP Well Heads & 18 Fatigue joints
    Installation date: Feb 2014
    Project value: $1.200, 000 AUD

    Cormac Case history - Offshore

    Project: Haf Dan- TSA & HT aluminium silicone ealer application
    Client: Sembawang Shipyard
    Owner: Maersk Ole
    Scope: TSA of 1200 m2 underside of 01 deck
    Installation date: Aug2010
    Project value:  SG$64,000 (AUD $50,000)

    Cormac Case history - Chemical Refining

    Project: Lychee project Malaysia
    Client: KNM Fabrications/Foster Wheeler -Gebang Malaysia
    Owner: BP built by SBM
    Scope: TSA of 21L x 4.5mt diameter tanks
    Installation date: Feb 2014
    Project value: AUD $175,000

    Cormac Case history

    Project: Thermally sprayed anode for Dyke 1 Dolphins 2 and 3, Dyke 2 Dolphin 6
    Client: Newcastle Port Corporation (NPC)
    Scope: Zinc Anode application to 3 concrete Dolphins including 3 tests and monitoring panels. Total area 330 m2
    Installation date: June & July 2011
    Project value:  AUD$360,000

    Cormac Case history - Offshore

    Project: SKARV Turret
    Client: Keppel Fels Shipyard - Singapore
    Owner: BP built by SBM
    Scope: TSA of 21 ‘I’ tubes internal 1m diameter x  6 metres long
    Installation date: Feb 2010
    Project value:  SG$95,000 (AUD $82,000)

    Cormac Case history

    Project: Thermal Spray of all facilities within the terminal
    Client: PKCT (Port Kembla Coal Terminal) Installation date: Commenced 2010 - Ongoing to date
    Project value:  AUD$1,000,000

    Cormac Case history - Offshore

    Project: GUMUSUT FFPSO
    Client: MMHE Shipyard - Malaysia
    Owner: SSPC SHELL/PETRONAS
    Scope:  TSA of Cassion pipes internal & external & sealer
    Installation date: Aug 2011to Jan 2012
    Project value:  RM$2.500, 000 (AUD $781,000) Cormac portion $155,000

    Cormac Case history - Offshore

    Project: Thermal aluminium spray of ducts and vessels in the Acid Plant
    Client: VALE GORO
    Owner: GORO Nickel
    Scope: New Caledonia
    Installation date: 2010, 11, 12
    Project value:  Approx $250,000

    Cormac Case history - Offshore

    Project: Flare tower - TSA & HT aluminium silicone ealer application
    Client: Sembawang Shipyard
    Owner: Maersk Ole
    Scope:  TSA of 4500 m2 entire flare tower
    Installation date: October 2010 – Dec 2010
    Project value:  SG$550,000 (AUD $715,000)

    Cormac Case history - Offshore

    Project: thermal spray of irrigation radial gates
    Client: Coleambally Irr
    Owner: Coleambally Irr
    Scope: structures and bores
    Installation date: since 2001 - Ongoing
    Project value:  Approx $100,000 per year